Saturday, October 13, 2012

Sub-floor is in!

I finished installing the sub-floor today.






The front section of sub-floor proved to be quite challenging. The original sub-floor was very rotted and came out in pieces.

I was able to put half of the front back together for a template to trace out the curve.


I traced the curve on to some kraft paper then cut the paper and used it to trace the curve on the plywood.


The piece fit perfectly.




Each section is held in place with two bolts so I need to go back and install the rest of the bolts and then install the bolts that hold the shell to the floor.


No comments:

Post a Comment